Ongoing projects
What is still moving, which bot is watching it, and how healthy it looks.
Updated Today · 20:35
Amber
Cell · Cell
Cell first-client work cell
Layout locked; floor verify open
Work cell v0 locked: fixed flat table + overhead laser portal. Value = pick&place + data collection, not OEM rebuild.
Next · Floor sync Ondrej (CNC/lathes/Cell) + Q3 lid interlock verify 4 Oct
- D-011 floor sync Ondrej pending
- D-015 lid interlock floor verify pending
- Portal travel / rails registration / enclosure open with Ondrej/Illja
Last update Yesterday · 12:00
Amber
Fleet · Fleet
Fleet / PND actuators & spares
Spares MAYBEs + HW issue list open
Prefer no hands/no head. 2nd-robot bring-up for Kamil; Adam-U calibration method documented (D-052).
Next · Lock D-005 MAYBEs and grow D-017 PND HW issues list 2 Oct
- Brian MAYBE stand/cylinders undecided (D-005)
- Waiting PND reply on actuators-only sales (D-018)
- Ahmed actuator test stand parked (D-035)
Last update Yesterday · 13:57
Amber
NG / Gambit · Gambit / ng-design
Neural Gambit camera rig
TOP PRIORITY — in progress
Under-wrist cameras mounted; DigiKey LED kit ordered for active light. Refs: ng-design/OPEN.md, ng-design/specs/camera-rig/.
Next · 10-min spec chat Kamil+Ilia, then Kosta design approach + prototype 3 Oct
- Spec chat with Kamil + Ilia not held yet
- Camera path open: strip RS into NG housing vs off-the-shelf D405 on rig (OPEN-002)
Last update Today · 17:00
Amber
Cable tester · Altium
PND cable / harness tester
Weekend DoD-B push
SPEC-v0.4, KiCad schematic ERC clean. Owns Desk D-019. Miro PCB flow board live.
Next · Altium lib live + schematic fixed Sat; 4-layer place/route Sun 4 Oct
- Altium import: footprints missing + unwired nets
- HAL9000 library migrate pending
- Layout / Gerbers not started; JLCPCB holiday Oct 1–4
Last update Today · 17:55
Green
Lab / Shop · Desk / Shop
Lab rework stations (JBC etc.)
JBC follow-up in flight
Brian agreed JBC rework + high-precision stations. Buy-list CSV ready; no amounts in Hub seed.
Next · JBC C105 / high-precision quote reply + Fri desk setup 3 Oct
- Awaiting JBC Inside Sales reply on C105 exchange
- Gap list vs already-bought stations — see shop/REWORK-STATIONS-GAP.md
Last update Today · 17:40